timeline to proj 7 as default in OSGeo4W

classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

timeline to proj 7 as default in OSGeo4W

Helmut Kudrnovsky
hi,

the question is related to

[Feat] PROJ 7.0.0 released - check for adaption in (win)GRASS
https://github.com/OSGeo/grass/issues/395

[...]
check for needed adaptions in (win)GRASS; e.g. which PROJ-data package
should be included in standalone installers, etc.
[...]

PROJ 7.0.0 will be a big break how PROJ, projections and grids are handled.

is there any timeline for proj 7 in OSGeo4W?

should we prepare a coordinated timeline for a switch in a mid/long term?



-----
best regards
Helmut
--
Sent from: http://osgeo-org.1560.x6.nabble.com/osgeo4w-dev-OSGeo-Win32-Installer-List-f3765018.html
_______________________________________________
osgeo4w-dev mailing list
[hidden email]
https://lists.osgeo.org/mailman/listinfo/osgeo4w-dev
best regards
Helmut