Proj version 4.5.0 - datum shifts

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

Proj version 4.5.0 - datum shifts

Bart Adriaanse
Any news on the 4.5.0 final release date ?

I just downloaded the 4.5.0 version beta, compiled it to a dll, it seems to
work fine.

I will be testing this on the Dutch system (Amersfoort/RDNAP) using 7
parameter datum shifts.

I guess testing the 7 parameter shifts *before* the beta goes final is a
good idea, so i'll post back here after i do, anybody here who tested this
recently ?

a thread on this way back (version 4.4.3):

http://lists.maptools.org/pipermail/proj/2001-January/000132.html

thanks for your interest,

Bart Adriaanse
The Netherlands




_______________________________________________
Proj mailing list
[hidden email]
http://lists.maptools.org/mailman/listinfo/proj